|
| | General
Dynamics
Electronics
Facility
Space
Study
San
Diego,
California
| |
|
| |
|
| |
The fast track scope accomplished was to develop a space utilization study and create various installation master plans for the entire 500,000 SF complex. Facility realignment was based on changing manufacturing policy and needs of ten major departments with a goal to minimize relocation time, disruption of operations and associated construction cost. The results were achieved through field surveys, interviews, workshops, process analysis and computer documentation.
|
|